A safety training director at a 22-site chemicals company turns a near-perfect dashboard, a contractor portal and an audit tracker into the three exceptions her COO needs to act on, with any AI chat her company allows.
A dashboard at 98.6%, a site celebrating 100%, and an audit finding marked closed. Everything looks green. The exceptions are in who isn't counted and what "closed" really means.
Here the AI hunts for exceptions. The prompt tells it what to distrust.
Use the AI tool your company approves: ChatGPT, Claude, Gemini or Copilot.
Copy the prompt and the six fictional inputs from the appendix into one message.
Check one exception against its record. Then cut anything that's noise and decide what the committee must do.
I lead safety and compliance training at a specialty chemicals company with about 13,000 employees, plus contractors, at 22 sites. Today is November 16. Our COO and EHS committee meet on November 24 and want process safety training exceptions only, by site, and what I need from them. Below are this month's training exports, our contractor portal export, the incident retraining tracker, an internal audit extract and an email from one site.
Please give me:
Be skeptical. Check who is and isn't counted in each number, check due dates against today's date, and check that anything marked complete or closed is backed by the records. If something is missing or can't be verified, say so. Don't add facts that aren't in the inputs.
Exactly as it came back, not edited. Read it the way Grace did: check each point against the source it cites.
Short answer for Daniel: not everything is fine. The 98.6% leaves out contractors and one whole site. It also counts as compliant 46 people at Vellmar whose due dates were pushed back. And three safety-critical training items are open or can't be checked.
| Site | What's wrong | How many | How overdue (today is Nov 16) | Source |
|---|---|---|---|---|
| 15 Ravensby | Management of change (MOC) training for the new reactor control system (course MOC-RX-15) has not been delivered. Audit finding F-3 was marked "Closed" on Oct 20, but the only evidence was "Training material uploaded to LMS." Uploading material is not delivering training, and the LMS shows 0 completions. | 64 assigned, 0 completed | The audit says the training was due before start-up, and start-up has already happened. The start-up date isn't given, so how long it's been overdue can't be worked out. The finding has been wrongly shown as closed for 27 days. | [2], [5] found |
| 15 Ravensby | Contractors without a current process safety orientation. | 18 of 140 (87%) | No due dates in the export | [3] |
| 15 Ravensby | Retraining after incident 26-044 is shown as 9 of 9 done. No completion records back this up. | 9 | Was due Oct 31. Unverified | [4] A: cut |
| 07 Port Arden | Retraining after incident 26-031 (line break release) is incomplete. | 7 of 18 operators not done | 47 days overdue (due Sep 30) | [4] found |
| 07 Port Arden | Contractors without a current orientation. | 34 of 210 (84%) | No due dates in the export | [3] |
| 12 Kessel | Contractors without a current orientation. Turnaround starts Dec 1, in 15 days, with about 300 more contractors. | 76 of 290 (74%) now, plus about 300 arriving | Contractors must be current before the turnaround starts | [3] found |
| 12 Kessel | Retraining after incident 26-052 (hot work near flammables): the 24 contractors are marked "n/a (contractor portal)". The portal export only shows orientation status, not this retraining, so nobody is tracking it. The 6 employees are shown as done, but no completion records back this up. | 24 contractors: Unknown | Due Nov 30, in 14 days | [3], [4] found |
| 19 Halbrook | Not in the LMS report at all ("pending migration"). | Unknown | Unknown | [2] |
| 22 Vellmar | The 100% includes 46 learners whose due date the site admin pushed back 90 days on Oct 2. Nothing shows who approved this or why. The coordinator's "100%" email doesn't mention it. | 46 of 420 | Their original due dates aren't given. Without the extension, they may already be overdue. | [2], [6] found C: softened |
Not shown by site: the dashboard reports 174 employees as non-compliant (12,400 − 12,226) but doesn't say which sites they're at.
Claude found every planted problem. It also flagged a few things that weren't problems. Grace's edits are about what a COO needs from one page, and how to treat a site that may have had a good reason.
Use it on any compliance or certification report that looks too good: safety, quality, regulatory, IT security training.
I lead [your function] at a [industry] company with about [number] people at [number] sites. Today is [date]. [Your audience] meets on [date] and wants [what they asked for]. Below are [the exports, trackers, audit extracts and emails].
Please give me: 1. Exceptions by site (a table with the site, what's wrong, how many people, how overdue, and which input shows it); 2. What makes our overall number look better than it is, if anything; 3. What I need from [audience]: no more than three asks.
Be skeptical. Check who is and isn't counted in each number, check due dates against today's date, and check that anything marked complete or closed is backed by the records. If something is missing or can't be verified, say so. Don't add facts that aren't in the inputs.
Copy the prompt, then all six inputs, into one message in a new chat. Everything here is fictional and safe to paste.
I lead safety and compliance training at a specialty chemicals company with about 13,000 employees, plus contractors, at 22 sites. Today is November 16. Our COO and EHS committee meet on November 24 and want process safety training exceptions only, by site, and what I need from them. Below are this month's training exports, our contractor portal export, the incident retraining tracker, an internal audit extract and an email from one site. Please give me: 1. Exceptions by site: a table with the site, what's wrong, how many people, how overdue, and which input shows it. 2. What makes our overall number look better than it is, if anything. 3. What I need from the committee: no more than three asks. Be skeptical. Check who is and isn't counted in each number, check due dates against today's date, and check that anything marked complete or closed is backed by the records. If something is missing or can't be verified, say so. Don't add facts that aren't in the inputs. [1] Email from Daniel Reyes, Chief Operating Officer Subject: EHS committee Nov 24 Grace, same format as always: exceptions only, by site, and what you need from us. I don't want a wall of green. If everything really is fine, tell me in one line. [2] LMS dashboard export: process safety training, November Process safety training compliance: 98.6% · 22 sites Required: 12,400 · Compliant: 12,226 Population: active employees. Contractors are tracked in the contractor portal. Sites in report: 21 (Site 19 Halbrook: pending migration to LMS) Site 22 Vellmar: 100% (420 of 420) Admin log, Site 22: due date extended by 90 days for 46 learners (Oct 2, site admin) Course MOC-RX-15 (Management of change: new reactor control system, Site 15): assigned 64 · completed 0 [3] Contractor portal export, November (three sites with the most contractors) | Site | Contractors on site | Current process safety orientation | % | |---|---|---|---| | Site 07 Port Arden | 210 | 176 | 84% | | Site 12 Kessel | 290 | 214 | 74% | | Site 15 Ravensby | 140 | 122 | 87% | | Total | 640 | 512 | 80% | Note: Site 12 turnaround starts December 1 with about 300 additional contractors. [4] Incident-linked retraining tracker | Incident | Site | Date | Who must retrain | Due | Done | |---|---|---|---|---|---| | 26-031 Line break release | 07 Port Arden | Aug 14 | 18 operators | Sep 30 | 11 | | 26-044 Pump seal fire | 15 Ravensby | Sep 22 | 9 maintenance technicians | Oct 31 | 9 | | 26-052 Hot work near flammables | 12 Kessel | Oct 19 | 6 employees, 24 contractors | Nov 30 | 6 employees · contractors: n/a (contractor portal) | [5] Internal audit memo (October), action tracker extract Finding F-3 (Site 15): Management of change training was not delivered for the new reactor control system before start-up. Action: deliver MOC training to all affected operators. Status: Closed, Oct 20. Evidence: "Training material uploaded to LMS." [6] Email from the Site 22 Vellmar training coordinator Subject: Good news Hi Grace, Vellmar is at 100% on process safety refreshers this month. Great effort from the team!I lead safety and compliance training at a specialty chemicals company with about 13,000 employees, plus contractors, at 22 sites. Today is November 16. Our COO and EHS committee meet on November 24 and want process safety training exceptions only, by site, and what I need from them. Below are this month's training exports, our contractor portal export, the incident retraining tracker, an internal audit extract and an email from one site.
Please give me:
Be skeptical. Check who is and isn't counted in each number, check due dates against today's date, and check that anything marked complete or closed is backed by the records. If something is missing or can't be verified, say so. Don't add facts that aren't in the inputs.
Subject: EHS committee Nov 24
Grace, same format as always: exceptions only, by site, and what you need from us. I don't want a wall of green. If everything really is fine, tell me in one line.
Process safety training compliance: 98.6% · 22 sites Required: 12,400 · Compliant: 12,226 Population: active employees. Contractors are tracked in the contractor portal. Sites in report: 21 (Site 19 Halbrook: pending migration to LMS)
Site 22 Vellmar: 100% (420 of 420) Admin log, Site 22: due date extended by 90 days for 46 learners (Oct 2, site admin)
Course MOC-RX-15 (Management of change: new reactor control system, Site 15): assigned 64 · completed 0
| Site | Contractors on site | Current process safety orientation | % |
|---|---|---|---|
| Site 07 Port Arden | 210 | 176 | 84% |
| Site 12 Kessel | 290 | 214 | 74% |
| Site 15 Ravensby | 140 | 122 | 87% |
| Total | 640 | 512 | 80% |
Note: Site 12 turnaround starts December 1 with about 300 additional contractors.
| Incident | Site | Date | Who must retrain | Due | Done |
|---|---|---|---|---|---|
| 26-031 Line break release | 07 Port Arden | Aug 14 | 18 operators | Sep 30 | 11 |
| 26-044 Pump seal fire | 15 Ravensby | Sep 22 | 9 maintenance technicians | Oct 31 | 9 |
| 26-052 Hot work near flammables | 12 Kessel | Oct 19 | 6 employees, 24 contractors | Nov 30 | 6 employees · contractors: n/a (contractor portal) |
Finding F-3 (Site 15): Management of change training was not delivered for the new reactor control system before start-up. Action: deliver MOC training to all affected operators. Status: Closed, Oct 20. Evidence: "Training material uploaded to LMS."
Subject: Good news
Hi Grace, Vellmar is at 100% on process safety refreshers this month. Great effort from the team!